Technical Process Guide
SLCA Battery Repair Training
11-step process from sourcing to ongoing monitoring
Contents
1
Pre-Reading Sources
2
Applicable Standards
3
PPE
4
Incoming Battery Shipping
5
Incoming Battery Inspection & Sorting
6
Battery Handling & Storage
7
Cell Health Testing (UL1974)
8
Battery Disposal Record Form
9
Commissioning / Testing
10
Deployment & Install
11
Ongoing Monitoring
1
Pre-Reading Sources
Internal Document
SCLA Risk Management Plan
Samsung SDI 94Ah Cell Datasheet
Energy Storage System Design Guides
Internal Document
SLCA Project Overview
Internal Document
Anatonmy of a Solar Battery
Internal Document
Design considerations of batteries
Internal Document
SLCA Generic Build Activities Timeline
2
Applicable Standards
UL1974 – Evaluation for Repurposing Batteries
IEC 62619 – Lithium Battery Safety
Electrical Safety Code of Practice 2020
AS/NZS 3000 - Australian/New Zealand Wiring Standards
AS/NZS 5139 - Electrical installations – Safety of battery systems for use with power conversion equipment
3
PPE
Electrical Safety PPE Requirements
Battery Handling PPE Guide
4
Incoming Battery Shipping
Transport Operations - Dangerous Goods Act
High voltage battery pack dissessmbly
Internal Document
Dissassembly of HV EV battery Pack
Internal Document
SLCA Receiving Procedure Checklist Form
Internal Document
SLCA Receiving Procedure Checklist Results
5
Incoming Battery Inspection and Sorting
Internal Document
SLCA Inspection Checklist
Internal Document
Sorting by Voltage / Condition
6
Battery Handling and Storage
NSW Battery Storage Guide
Temperature and Fire Safety Guidelines
7
Cell Health Testing (UL1974)
Internal Document
SLCA UL1974 Evaluation Process
Internal Document
SLCA Public EV Module Testing Form
Internal Document
SLCA Public EV Module Testing Results
Workflow Crossroad: Leave BMS Attached or Assign New During Assembly
8
Battery Disposal Record Form
Internal Document
SLCA Disposal Documentation Form
Internal Document
SLCA Disposal Documentation Results
Internal Document
Hazardous Waste Compliance
9
Commissioning / Testing (In-House)
System Commissioning Checklist
Battery System Testing Procedure
10
Deployment and Install
Internal Document
Site Installation Procedure & Sign Off
11
Ongoing Monitoring
Internal Document
Remote Monitoring Procedure and Outcome